新聞中心
新聞資訊
聯(lián)系我們

山東途暢路橋工程有限公司
聯(lián)系人:石總
電話:18264104888
地址:山東省濟南市槐蔭區(qū)經一路273號群盛華城
冷再生機工程的施工要做好準備工作
來源:http://www.cpssc145.com/ 日期:2022-09-13 發(fā)布人:
冷再生機租賃廠家在道路施工前要做好充分的準備工作,才能保障整個施工過程的順利進行,需要做好哪些準備工作呢?
The leasing manufacturer of cold recycling machine should make full preparations before road construction to ensure the smooth progress of the whole construction process. What preparations should be made?
1、要建立嚴謹、規(guī)范的內部約束、考核、激勵機制,用制度管人,用規(guī)章管理工程。
1. We should establish strict and standardized internal restraint, assessment and incentive mechanisms, manage people with systems and manage projects with rules.
2、要補充調查工程沿線影響施工的因素,標注出平面位置圖,并進行、論證,寫出調查報告,作為修訂施工方案、編制施工控制預算的依據(jù)。
2. The factors affecting the construction along the line of the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be prepared and demonstrated to serve as the basis for revising the construction scheme and preparing the construction control budget.
3、施工圖紙,吃透設計意圖,澄清圖紙中的問題,恢復定線和施工放樣。對所有控制點進行加密、保護、記錄。
3. Construction drawings, thoroughly understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根據(jù)施工合同協(xié)議和現(xiàn)場調研認真編制施工控制預算,作為控制支出、進行成本預測分析、經濟核算以及統(tǒng)計工程進度的依據(jù)。
4. The construction control budget shall be carefully prepared according to the construction contract agreement and on-site investigation as the basis for expenditure control, cost prediction and analysis, economic accounting and project progress statistics.
5、進行業(yè)務、技術培訓和技術交底,使相關人員對工程的技術標準、操作規(guī)程、質量控制、資料整理有多方面的了解。
5. Conduct business, technical training and technical disclosure to enable relevant personnel to understand the technical standards, operating procedures, quality control and data collation of the project in many aspects.


6、建立工地試驗室,并申請臨時資質。對施工中擬使用的各種原材料取樣試驗,建立相關技術參數(shù)的數(shù)據(jù)庫。
6. Establish site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in the construction, and establish a database of relevant technical parameters.
7、繪制關鍵工序施工工藝流程圖和試驗操作規(guī)程、質量檢查評定、計量支付、設計變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagrams, and put the charts on the wall.
8、根據(jù)工期要求、技術標準、機械設備能力、材料供應、自然條件等進行綜合分析,選擇佳施工方案,完善施工組織設計。
8. According to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., comprehensive analysis shall be conducted to select the best construction scheme and improve the construction organization design.
冷再生機工程的施工要做好準備工作才行,這樣才能更好的讓工程項目的率的完成,更多相關內容就來我們網(wǎng)站http://www.cpssc145.com咨詢吧!
The construction of the cold recycling machine project should be well prepared, so as to better ensure the safe and efficient completion of the project. Please come to our website for more relevant content http://www.cpssc145.com Consult!
下一篇:就地冷再生常用的一種施工方案如何 上一篇:不用壓路機時保養(yǎng)顯得尤為重要
閱讀/ Recommended reading
- 冷再生機租賃:改良土會用到哪些設備? 2025-04-18
- 租賃冷再生機有什么優(yōu)勢 2025-04-15
- 冷再生機租賃燃油費和操作手費用誰承擔? 2025-04-14
- 冷再生機租賃:粉料撒布車工作原理及優(yōu)勢 2025-04-12
冷再生機有哪些類型
[2018-08-23]
在現(xiàn)代交通網(wǎng)絡持續(xù)發(fā)展的進程中,道路養(yǎng)護成為保障交通順暢的關鍵環(huán)節(jié)。冷再生機作為道路養(yǎng)護領域的重要設備,憑借其獨特的技術和顯著優(yōu)勢,為道路的可持續(xù)發(fā)展提供了有力支持,成為道路建設...