新聞中心
新聞資訊
聯(lián)系我們

山東途暢路橋工程有限公司
聯(lián)系人:石總
電話:18264104888
地址:山東省濟南市槐蔭區(qū)經(jīng)一路273號群盛華城
冷再生機使用前要做好哪方面的準備
來源:http://www.cpssc145.com/ 日期:2023-07-07 發(fā)布人:
1、冷再生施工租賃場地準備
1. Preparation of rental site for cold regeneration construction
(1)直接填筑的路基基底,施工前必需經(jīng)過檢查簽證;需求停止地基處置的基底必需完成各項處置,并滿足地基處置的請求。
(1) The roadbed base directly filled must undergo inspection and certification before construction; The foundation that requires cessation of foundation disposal must complete all disposal tasks and meet the requirements for foundation disposal.
(2)場地應該保證足夠的平整度,滿足設(shè)備、人員進場請求。
(2) The site should ensure sufficient flatness to meet the requirements for equipment and personnel entry.
(3)做好場地的暫時排水和防雨措施。依照施工運量和施工機械的大荷載建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. According to the construction traffic volume and construction machinery, a large load construction road is constructed.


2、技術(shù)準備
2. Technical preparation
冷再生機租賃廠家提醒您要做好相關(guān)人員的技術(shù)培訓和技術(shù)交底工作,使參與施工的全體人員充沛認識高速鐵路路基填筑的關(guān)鍵技術(shù)、質(zhì)量控制要點。
The manufacturer of the cold recycling machine reminds you to provide technical training and disclosure to relevant personnel, so that all personnel involved in the construction can fully understand the key technologies and quality control points of high-speed railway roadbed filling.
3、勞動力、機械設(shè)備配置人員、機械設(shè)備應依據(jù)施工計劃組合工期請求停止合理的配置。路堤填筑區(qū)為一個完好的作業(yè)區(qū),每個作業(yè)區(qū)人員配置:施工隊長1名,領(lǐng)工員2名,指揮卸土位置人員2名,丈量及實驗檢測人員4~6人,其他機械工、普工20~30人。
3. Labor force, mechanical equipment allocation personnel, and mechanical equipment should be requested to stop reasonable allocation based on the construction plan and construction period. The embankment filling area is a complete operation area, with one construction team leader, two foremen, two personnel commanding the unloading position, 4-6 measuring and experimental testing personnel, and 20-30 other mechanical and general workers in each operation area.
依據(jù)施工需求,每個作業(yè)面裝備反鏟發(fā)掘機一臺、宣化-140推土機一臺、YZ-22振動壓路機兩臺、天工-160平地機一臺,徐工-230灰土拌和機,自卸運輸車6輛,撒水車一臺備用。當運距較遠時,自卸車的數(shù)量可恰當增加
According to the construction requirements, each working face is equipped with one backhoe excavator, one Xuanhua 140 bulldozer, two YZ-22 vibratory rollers, one Tiangong 160 Grader, XCMG 230 lime soil mixer, six dump trucks and one sprinkler for standby. When the transportation distance is far, the number of Dump truck can be appropriately increased
冷再生機使用前要做好哪方面的準備相關(guān)內(nèi)容就講解到這里了,希望能夠給您好的幫助,更多事項就來我們網(wǎng)站http://www.cpssc145.com咨詢吧!
That's all we need to do before using the cold recycling machine. We hope it can be helpful to you. For more information, please come to our website http://www.cpssc145.com Consult!
下一篇:冷再生機時打滑的原因及方法 上一篇:路面冷再生機構(gòu)成以及其工作原理
閱讀/ Recommended reading
- 冷再生機租賃:改良土會用到哪些設(shè)備? 2025-04-18
- 租賃冷再生機有什么優(yōu)勢 2025-04-15
- 冷再生機租賃燃油費和操作手費用誰承擔? 2025-04-14
- 冷再生機租賃:粉料撒布車工作原理及優(yōu)勢 2025-04-12
冷再生機有哪些類型
[2018-08-23]
在現(xiàn)代交通網(wǎng)絡(luò)持續(xù)發(fā)展的進程中,道路養(yǎng)護成為保障交通順暢的關(guān)鍵環(huán)節(jié)。冷再生機作為道路養(yǎng)護領(lǐng)域的重要設(shè)備,憑借其獨特的技術(shù)和顯著優(yōu)勢,為道路的可持續(xù)發(fā)展提供了有力支持,成為道路建設(shè)...